Infrastructure

 

STATUS OF INFRASTRUCTURE IN JNV’S
 

I

Area of land  allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on

 

: 30.09 Acres

: Yes

 

: Yes

ii

Status of Boundary Wall

a.  Brick Wall
b.  Barbed wire fencing

 

: Incomplete, Partially wire fencing.

  80%
  20%

iii

Permanent buildings constructed

 

: CBRI pattern

 

iv

School building

 

: Complete

v

Dormitories

:  Boys ____24________   Nos.
   with Warden Residence__02__    Nos.

 

 

:  Girls _____10_______   Nos.
   with Warden Residence__02__    Nos.

vi

Kitchen/dining Hall

No. of shifts required for all students  to take food

 

: Complete, Area CBRI Pattern, CPWD    Design.

  One

vii

Principal Residence

 

:  _01_ No.

viii

Staff Quarters

 

 

: Type III = __12___ Nos.
  Type II = ___12__ Nos.
  Type  I  = ___12__ Nos.
  SP Sheds converted into Staff Qrs.:   Nil

ix

M.P. Hall

: Available

x

Workshop

: Available

xi

Type of O.H. Tank

Its capacity

Present Status

: Shaft type

:  _2 Lacs_ litres

: Working satisfactory

xii

U.G. tank

Its capacity

Present Status

: N/A

:  N/A

: Working satisfactory / not satisfactory

xiii

D.G. Set

 

 

:  Available
: _Kirloskar___ make
:   __25_ KV
: Working
: Year of procurement - 2007

xiv

Sewage Pump

: N/A, Required

xv

Water Pump

 

: _15HP__ capacity

xvi

Electrification

Electric connection
Sub Station building
Street lighting

Numbers of hrs. during day when power supply is available on an average.

  11KVA

 :  Rural
 :  Complete
 : 42  Nos. of Poles

 : __8.00__ hrs.
  

xvii

Playfields

400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 

 

: Available
:  __01__Nos.   – Available
:  __02___Nos.   – Available

xviii

Water supply
Tube Well
Hand pump
Connection from PHED

 


: Potable,  __01_ Nos.-  working
: Potable, __14__ Nos.-  working
:  _N/A__ hours supply in a day

xix

Rajiv Gandhi Smriti Van

:  Available

xx

Fire fighting arrangement

:  Working

xxi

Last date of cleaning of

  1. Septic tank
  2. Water tanks

 

: 14.02.2008
: 01.03.2008

xxii

Whether area around transformer is fenced

:  Yes 

xxiii

Whether open wells, if any, are covered from top

:   No

xxiv

Works taken up under M&R fund during current year and last year:-

: 2008-09 :350000/-

: 2009-10 : 450000/-

Year

Name of work  (M&R)

Expenditure
(Rs. In lacs)

Cumulative expenditure during the year

2008-09

M&R

350000/-

350000/-

2009-10

 

450000/-

205000/- till feb 2010

 

Details of vehicle provided to the Vidyalaya

 

(i)

Whether vehicle is provided or not (Yes/No)

Yes

(ii)

Description to vehicle.

Mini Bus Mahendra

(iii)

Model no and date of purchase.

16 Setter M&M 17.12.90

(iv)

Present condition of the Vehicle.

Under Critical condition functioning.